Manage the Team
Registered Constructor: 5 in total
Class-1 Constructor: 2 (electromechanical and construction engineering)
Class-2 Constructor:3 (direction of housing construction and mechanical and electrical installation)
The core technical and management personnel have more than 10 years of industry experience, covering the whole process of project management, quality and safety, and technical disclosure.
Scale of Construction Team
It has 30 + stable professional construction teams and 100 + skilled workers, and can carry out 5-8 large and medium-sized projects at the same time.
All personnel shall work with certificates (fireproof coating construction certificate, fire fighting facility operator certificate, safety officer certificate, special operation certificate, etc.).
Professional Construction Field
1. Construction of fireproof coating for steel structure
- Construction of all kinds of thin, thick and ultra-thin fire retardant coatings
- Applicable to factory buildings, venues, super high-rise buildings and bridge steel structures
2. Tunnel fireproof coating/fireproof protection construction
- Fireproof and heat insulation system for highway and railway tunnel
3. Fire protection facilities engineering
- Design and construction of automatic fire alarm, automatic fire extinguishing, smoke control and fire hydrant system
4. Anticorrosion and thermal insulation works
- Anticorrosion and thermal insulation construction of industrial equipment, pipeline and steel structure
Technology and Management Advantages
- Construction process: self-developed mechanized spraying + fine manual joint repair process, with uniform thickness, strong adhesion and controllable construction period.
- Safety management: zero safety accident construction record, full-time safety officer standing by the whole process.
Service Capability
- National construction: covering Henan, Shaanxi, Sichuan, Guangdong, Fujian, Shanxi, Guizhou and other provinces.
- Full-process service: scheme design → material supply → construction → acceptance → quality assurance integration.
- Warranty and after-sales service: 2-year warranty period after completion, life-long maintenance response.
The construction management personnel of our company are all senior professionals in fire retardant coatings, fire protection engineering, thermal insulation and anticorrosion, not ordinary civil engineering management personnel. The team has more than 20 years of experience in construction management of large-scale public buildings, tunnels, steel structures and super high-rise projects in Henan and the whole country. It has successively led the completion of key benchmarking fire protection projects such as Xinzheng International Airport, Museum of Chinese Characters, Qinling Tunnel, Lianhuo Expressway Tunnel, Xi'an Olympic Sports Center, Shenzhen Happy Harbour, Quanzhou Haisi Financial Center and Shugen Internet Building. Proficient in steel structure thin/thick fire protection, tunnel fire protection coating, external wall insulation and fire protection special subcontracting complete set of construction technology and acceptance specifications, familiar with the policy requirements of residential construction and fire protection acceptance in various places, familiar with technology, specifications, acceptance and site, and familiar with EPC general contracting docking, professional subcontracting coordination and cross construction management. Long-term cooperation with China Railway, China Construction and other large general contractors, stable and reliable reputation for performance. Henan Huiquan, as an integrated enterprise of self-produced fireproof coatings and independent construction, has dual professional abilities of production and construction, familiar with raw material performance, coating formula, construction parameters and fire detection indicators, and can quickly solve technical problems on site. Material, construction, quality, acceptance of the whole process of internal closed-loop management and control, effectively eliminate outsourcing and subcontracting wrangling, materials are not up to standard, jerry-building and other issues, cost control is fine and efficient, comprehensive cost performance is better than external outsourcing team; The project establishes a closed-loop management system for the whole process from scheme preparation, technical disclosure, on-site construction, thickness detection, self-inspection and re-inspection to fire control acceptance, strictly controls the coating quality and fire resistance limit, and has a high one-time acceptance rate. At the same time, it strictly implements the standardized management of construction safety and civilization, strengthens the management and control of high-altitude, fire and tunnel operations, and maintains zero for many years. The overall planning of the construction period is reasonable, the personnel scheduling is efficient, and the large-scale projects can enter the site quickly and be completed on schedule.